PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing split wire above the ceiling at the 4th Floor Facing North (800x600).jpg Duct work at the 1st (1) Floor Facing North (800x600).jpg Duct work at the 1st (2) Floor Facing North (800x600).jpg Installed hangers for the piping at the 1st Floor Facing West (800x600).jpg Layout for the 1st Floor Juvenile-Adult Cells Facing North-West (800x600).jpg Started laying out block at the 1st Floor Juvenile-Adult cells Facing North (800x600).jpg
Previous pageNext page Duct work at the 1st (2) Floor Facing North (800x600)
Duct work at the 1st (2) Floor Facing North (800x600)